Right of Way Project Controls Administrator at Valard Construction
Pay, openings, the application and what happens after you apply, for every time Valard Construction hires this role.
Quick answers
- Is Valard Construction hiring for it?
- Yes
- 1 opening
- How long do openings stay up?
- About 9 weeks
- Across 17 closed Valard Construction openings
Open now
Right of Way Project Controls Administrator
Valard Construction · Edmonton, Alberta, Canada · On-site
3 weeks ago
How often Valard Construction hires for this role
We’ve seen Valard Construction open this role once, in October 2026.
Open now, since October 27, 2026
Edmonton
From the postings Jobmagic has seen since we started following Valard Construction’s job board.
What happens after you apply
How long Valard Construction’s openings stay up
- All Valard Construction openings
- About 9 weeks
- Middle of 17 closed openings
This opening went up on October 27. If it follows Valard Construction’s usual pace, it may come down around the end of December, so applying soon gives you the best chance.
Counted by Jobmagic from when each opening was posted to when it came down. An opening usually comes down once it’s filled, though not always.
Is Valard Construction hiring?
- Open roles
- 30
- Busiest month
- October
- 23 new roles
- Mostly
- On-site
- 30 roles
- Main city
- Lloydminster
- 4 roles
Other roles Valard Construction hires for
- Powerline Technician (PLT) Apprentices4 openings
- Utility Construction Labourer4 openings
- Powerline Technician (PLT) or PLT Foreman / Foreperson4 openings
- Class 1A Licensed Operator4 openings
- Journeyperson Powerline Technician (434A / Red Seal)1 opening
- Powerline Technician Apprentice1 opening
- Fleet Manager (Transmission)1 opening
- Hydrovac Operator1 opening