Electrical Engineer II at Meade
Pay, openings, the application and what happens after you apply, for every time Meade hires this role.
Quick answers
- Is Meade hiring for it?
- Yes
- 1 opening
- How long do openings stay up?
- About 3 months
- Across 11 closed Meade openings
Open now
Electrical Engineer II
Meade · Remote
9 weeks ago
How often Meade hires for this role
We’ve seen Meade open this role once, in September 2026.
Open now, since September 14, 2026
From the postings Jobmagic has seen since we started following Meade’s job board.
What the application asks
- Questions
- 13
- 13 required
- Cover letter
- Optional
- Asks your pay
- No
- Asks about visas
- Yes
- What is your desired annual salary for this position?
- What's your earliest start date?
- Current State:
- Current City:
- Current Zip Code:
- Current Street Address:
- Plus 7 more questions
Jobmagic can fill in this application for you, with answers written from your resume. See how it works
What happens after you apply
How long Meade’s openings stay up
- All Meade openings
- About 3 months
- Middle of 11 closed openings
This opening went up on September 14. If it follows Meade’s usual pace, it may come down around early December, so applying soon gives you the best chance.
Counted by Jobmagic from when each opening was posted to when it came down. An opening usually comes down once it’s filled, though not always.
Is Meade hiring?
- Open roles
- 15
- 7 remote
- Busiest month
- November
- 5 new roles
- Mostly
- Remote
- 7 roles
- Main city
- Tempe
- 3 roles
Other roles Meade hires for
- Associate Director of Mechanical Engineering - West Coast Region1 opening
- Commissioning Manager1 opening
- Commissioning Technician1 opening
- Data Center Electrical Engineer (PE Required)1 opening
- Director of Mechanical Engineering - West Coast Region1 opening
- Electrical Commissioning Technician1 opening
- Electrical Designer II1 opening
- Electrical Engineer (PE) Data Center Load Management1 opening