Senior Data Center Construction Manager at AECOM
Pay, openings, the application and what happens after you apply, for every time AECOM hires this role.
Quick answers
- Is AECOM hiring for it?
- Yes
- 1 opening in North Las Vegas
- How long do openings stay up?
- About 4 weeks
- Across 361 closed AECOM openings
Open now
Senior Data Center Construction Manager
AECOM · North Las Vegas, NV · On-site
3 weeks ago
How often AECOM hires for this role
We’ve seen AECOM open this role once, in October 2026.
Open now, since October 28, 2026
North Las Vegas
From the postings Jobmagic has seen since we started following AECOM’s job board.
What happens after you apply
How long AECOM’s openings stay up
- All AECOM openings
- About 4 weeks
- Middle of 361 closed openings
This opening went up on October 28. If it follows AECOM’s usual pace, it may come down around the end of November, so applying soon gives you the best chance.
Counted by Jobmagic from when each opening was posted to when it came down. An opening usually comes down once it’s filled, though not always.
Is AECOM hiring?
- Open roles
- 2,114
- 241 remote
- Busiest month
- November
- 844 new roles
- Mostly
- Hybrid
- 1,335 roles
- Main city
- Chicago
- 77 roles
Other roles AECOM hires for
- Senior Electrical Engineer20 openings
- Asset Management Growth Leader – Water Utilities18 openings
- Structural Engineers and Designers16 openings
- Drainage Engineers and Designers16 openings
- Traffic Engineers and Designers16 openings
- Roadway Engineers and Designers16 openings
- Maintenance of Traffic (MOT) Engineers and Designers16 openings
- Senior Electrical and I&C CAD Design16 openings